Go to the Roofing & Staging page.

Go to the Mobile Staging page.

Go to the Show Seating page.

Go to the Other Projects page.

Go to the Slide Show page.

Go to the Contact Us page.

 

 

 

 


Welcome to Summit Staging Roof and Stage Structures.

Summit Staging Heavy Duty Roof Systems:
Our custom designed Total Structures roof system is, we think the best in the business.  The full roof set up is a 10 post 65’ wide x 55’ deep x 45’ high with 35’ x 25’ x 40’ or 25’ x 25’ x 40’ bays stage left and right. The modular design allows us to break down the roof into two 65’ x 45’ x 45’ or two 45’ x 45’ x 45’ four post roof systems. To set up the full roof system all we need is one forklift and local stagehands for approximately 8 to 12 hours.  No other heavy equipment is needed. A maximum uniformly distributed operating load of 40,000 lbs of production is allowed on the main structure and 20,000 lbs on each bay.
 
The stage is a weather resistant portable stage deck designed for outdoor applications.
The quad ripple deck surface has a non skid polypropylene finish and is rated at 200 LB per square foot.
The understructure is in 4’ x 8’ bays with a bridge design set up time for a 60’ x 40’ x 5’ with 24’ x 24’ x 5’ wings is approximately 4 to 8 hours.

Front of house positions, Crowd control barricade, l
oading docks and handicap ramps are also available.

Custom Designed Total Roof Systems

Click image to enlarge.


Custom Designed Total Roof Systems

Click image to enlarge.




email: .


 

Return to Home page.

 

 Published by: BFDNet
 © Copyright 2002 Summit Staging LLC